Architectural Design & Drafting

Drawings, permit filings and plan approvals in New York City, Nassau County and Suffolk County.

What we do

Before a building department issues a permit, it wants to see drawings. We draw them. Our team includes licensed architects, and we handle the filing and the back and forth with the city or town until the plans are approved. If you want us to build the job afterwards, we can, which also means the drawings get checked against real construction costs before you commit.

Most of what we draw falls into these groups:

  • Measured drawings of your existing building
  • Floor plans and layout options
  • Full construction drawings
  • Zoning and code review
  • Permit applications
  • Answers to plan examiner comments
  • Variance and special permit applications
  • Additions, basement and attic conversions, and changes of use
  • As-built drawings for work that is already done

NYC Department of Buildings

In the five boroughs, most work needs a DOB permit before anyone starts. We prepare the drawings, file through DOB NOW and answer the plan examiner objections until the plans are approved. That includes new buildings and enlargements, alterations (Types 1, 2 and 3), changes of use or occupancy, and legalizing work that was done without a permit. We stay on through final sign-off and the certificate of occupancy.

Our architects sign and seal the drawings and file as the applicant of record.

Board of Standards and Appeals

If a project does not fit the zoning rules, the BSA can grant a variance or a special permit. It also hears appeals of DOB decisions. We put together the drawings, zoning analysis and supporting documents for the application, and we go through the hearing process with you.

The board makes the decision, not us. What we can do is tell you up front whether your project is likely to need relief and what that will involve.

The buildings we work on

New York has been building for a long time, and the age of your building shapes the job. A few examples:

  • Rowhouses, brownstones and townhouses. Most were built between about 1870 and 1930 in brick and stone, which became the standard after the Great Fire of 1835. Renovations and rear additions have to work with the original structure.
  • Older tenements and apartment buildings. Layout, egress and occupancy are the usual problems when converting or legalizing space.
  • Queens. Tudor Revival and Victorian single-family houses, split two-family homes, and 1920s garden apartments like those in Jackson Heights.
  • Brooklyn. Row houses in Brooklyn Heights and Queen Anne houses in Dyker Heights.
  • Staten Island. Much of its growth came after the Verrazzano-Narrows Bridge opened in 1964.
  • Landmarks. The Landmarks Preservation Commission was created in 1965, after Penn Station was torn down. Exterior work on a landmark or in a historic district usually needs its approval as well as DOB approval.
  • Zoning. City zoning started with the 1916 Zoning Resolution and still controls height, setbacks and how a lot can be used. We check it before the design is final.

Background: Architecture of New York City, Wikipedia.

Nassau and Suffolk Counties

Outside the city, permits come from the town, village or city building department instead of DOB. We draw to the New York State building code and local zoning, file with whichever department covers your property, and prepare the application to the local Zoning Board of Appeals if you need a variance. In Suffolk County, some projects also need Department of Health Services review, and we help coordinate that when it applies.

A lot of Nassau and Suffolk was built after World War II. In Levittown, more than 17,000 houses went up between 1947 and 1951, Cape Cods at first and ranches from 1949, all on concrete slabs with no basement. Many have been enlarged since. A second floor, a rear addition or a dormer on one of these houses needs drawings and a permit from the local building department.

Background: American Heritage and Hofstra University, Levittown collection.

How it works

  1. We meet and visit the property.
  2. We measure and draw what is there now.
  3. We go over layouts with you.
  4. We prepare construction drawings and check them against code.
  5. We file and answer any objections.
  6. Once the permit is issued, we can build it.

How long approval takes depends on the agency and the project.

Start your project

Tell us about your property and what you want to build, or call us at 347-514-6785.

Areas we serve

From first sketch to finished home

The same team draws the plans, files them and builds the job. Here is how a project moves from idea to front door.
1

Concept

We walk the property, take measurements and sketch ideas with you.

2 32 ftLIVINGKITCHENBEDROOM

Floor plans

Layouts drawn to scale, with room sizes and dimensions.

3 FRONT ELEVATION

Elevations and sections

How the building looks from outside and how it is put together inside.

4 MechanicalElectricalPlumbing

MEP drawings

Mechanical, electrical and plumbing: ducts, wiring and pipes, drawn to fit the structure.

5 A-101 M-201 E-301 P-401APPROVED

Drawing set and approval

The full set is filed with the building department and revised until it is approved.

6

Construction

With the permit issued, our crew builds from the approved set.

7

Finished home

Final inspection, sign-off, and the keys.

Got a project that needs plans?

Send us the address and a short description of the work. We will tell you what drawings and approvals it needs.
© Copyright 2026 Marvel Contracting